NVIDIA publishes no price for Vera Rubin. Analyst and supply-chain estimates put one Vera Rubin NVL72 rack at about $5 million to $9.1 million: $5 million to $7 million in a March 2026 supply-chain report, about $7.8 million from Morgan Stanley in May 2026 and about $9.1 million from Bernstein in June 2026. Production shipments began in August 2026 and the first racks went to large cloud providers. No price has been reported for the 8-GPU HGX Rubin NVL8 server.
Prices we have seen
| What | Seller or source | Price | Kind of price | Date |
|---|---|---|---|---|
| Vera Rubin NVL72 rack, price to hyperscalers | Morgan Stanley, as reported by FlexiCloud | About $7.8M | Analyst estimate | May 2026 |
| Vera Rubin NVL72 rack, built up from parts | Bernstein, as reported by FlexiCloud | About $9.1M | Analyst estimate | June 2026 |
| Vera Rubin NVL72 rack, including about $1M of flash storage | Tom's Hardware, as collected by QuantaCloud | $5M to $7M | Supply-chain report | March 24, 2026 |
| Rubin racks | Wolfe Research, as collected by QuantaCloud | $5M to $6M | Analyst estimate | January 30, 2026 |
| HGX Rubin NVL8, the 8-GPU server | FlexiCloud | No price reported | None published | As of October 24, 2026 |
Public prices, last checked November 27, 2026. Asking and published prices, not sold prices and not our quote.
Lead time
NVIDIA said on its August 26, 2026 earnings call that production shipments of Vera Rubin began that month. CoreWeave named its first production customer on a Vera Rubin NVL72 cluster on September 30, 2026, and NVIDIA and Oracle said NVL72 instances were generally available on Oracle Cloud on October 27, 2026. So far the racks have gone to large cloud providers. The 8-GPU HGX Rubin NVL8 server has been announced as planned, with no ship date.
What the site has to supply
- Power: NVIDIA says to size for 227 kW per rack at full power. Lower power settings run at 187 kW and 156 kW. A GB300 NVL72 is planned for up to 142 kW.
- Liquid cooling: required.
Most data center space built before 2025 cannot take a rack like this without new power and cooling. Sort out the site before the hardware.
The 8-GPU Rubin server
The HGX Rubin NVL8 puts eight Rubin GPUs on one board in a server, the way the HGX B300 does for Blackwell. It is the version most companies outside the largest clouds will buy. As of late November 2026 it has no published price and no ship date.
What you can buy today
If you need capacity in the next few months, the hardware that is shipping is Blackwell: the 8-GPU HGX B300 server and the GB300 NVL72 rack. Tell us what you are planning and when, and we will tell you plainly whether waiting for Rubin makes sense for your dates.
Have older servers?
H100, H200 and A100 servers you are replacing can go toward this order. See trade-in.
How to get a firm price
Every number above is a public asking or published price, with the date we saw it. None of them is our quote, and we never publish distributor or partner pricing. Your price is set per deal.
To get a firm price and delivery date we need four things: the end user's company name and website, where the hardware will be installed, the configuration and quantity, and the date you need it. Here is why. Send them on the quote page or with the one-page Quote Request Form, and we come back in writing.
We supply new systems through the official channel and built systems that already exist in the US, and quote both so you can compare the price and the date. Need to spread the cost? See how to finance AI servers.
Questions
How much does a Vera Rubin NVL72 rack cost?
NVIDIA publishes no price. Estimates range from $5 million to $7 million in a March 2026 supply-chain report to about $7.8 million from Morgan Stanley in May 2026 and about $9.1 million from Bernstein in June 2026.
Is Vera Rubin shipping?
Yes, to large cloud providers. NVIDIA said production shipments began in August 2026, and Vera Rubin NVL72 instances were announced as generally available on Oracle Cloud on October 27, 2026.
Can I buy an 8-GPU Vera Rubin server?
Not yet. The HGX Rubin NVL8 has been announced as planned, with no ship date and no published price as of late November 2026.
How much power does a Vera Rubin NVL72 rack need?
NVIDIA says to size for 227 kW per rack at full power, with lower settings at 187 kW and 156 kW. It requires liquid cooling.
- FlexiCloud, NVIDIA Vera Rubin: specs, price, release date, published Oct 24, 2026, read Nov 27, 2026
- QuantaCloud, NVIDIA Vera Rubin: specs, timing and servers, read Nov 27, 2026
- GPUwerk, Vera Rubin release date: what NVIDIA announced vs what ships, published Nov 7, 2026
Tell us what you need.
Part numbers, a workload, or a rough idea. We come back with options, prices and lead times, in writing.